Industry / Contractors

Contractors.
Build on data, not on hope.

For general contractors the cost of a bad decision is measured in concrete, steel and time. Site and project teams get real-time progress against the plan, safety monitoring on every camera and early warning on cost and delay. Before the site even opens, RediGo helps win the tender.

ConTxT. for Contractors

ConTxT gives general contractors AI on the jobsite: progress measured against BIM 4D, computer-vision safety monitoring, forward-looking cost and delay risk, and AI support for public tenders.

Focus

Where ConTxT helps

Progress vs. BIM 4D

Measured progress per work package from drone, 360° and site captures.

Worksite safety

PPE, unsafe behaviour and access monitored on live video.

Delay & cost risk

Variance and delay risk on the critical path, early enough to act.

Tenders

Find the right public tenders, check the documents and draft the envelopes with RediGo.

Signal path

Data in, decisions out

Contractors signal path: BIM 4D, Schedule / WBS, Drone & 360°, Site reports, RFIs, Contracts flow into Sal + Vera, which produces Progress %, Delay risk, Cost variance, SAL reports, Answers with sources.

Case studies

Results in the field

Impresa Costruzioni Ing. Enrico Pasqualucci S.r.l.

Hotel Corinthia – AI-Based Construction Safety Monitoring

Computer vision models analyze video streams to detect PPE violations, unsafe behaviors, and unauthorized access.

  • -40% safety incidents
  • real-time monitoring
  • improved compliance

Impresa Costruzioni Ing. Enrico Pasqualucci S.r.l.

Casa Angelini Phase III – AI-Based Progress Monitoring

AI models compare BIM 4D planning with site data (images, scans) to automatically assess work progress.

  • +30% accuracy in progress tracking
  • reduced delays
  • improved reporting

Impresa Pizzarotti & C. S.p.A.

Ospedale di Prato – Anomaly Detection & Predictive Maintenance

Development of a Digital Twin integrated with BMS and IoT data to monitor HVAC and critical systems. AI models identify anomalies and predict failures in advance.

  • -25% unplanned failures
  • -20% maintenance costs
  • improved operational continuity

Agents

Who does the work

Sal, Construction Progress Agent

Sal

Construction Progress Agent · assetOS

Cross-references BIM, schedule and on-site reports to surface cost and timeline drift in real time.

  • Track construction progress
  • Monitor cost & time variance
  • Manage RFI documents
  • Automate progress (SAL) reports
Vera, Worksite Safety Agent

Vera

Worksite Safety Agent · assetOS

Computer vision watches every camera 24/7 for missing PPE, access breaches and risky behaviour.

  • Detect missing PPE
  • Monitor site access control
  • Track safety certifications
  • Alert the HSE manager in real time

Track record

Engineering behind the AI

Selected projects by BIMON, the engineering company behind ConTxT. Source: bimon.it.
ProjectWhere · whenClientScope
Napoli Afragola stationAfragola, Italy · 2015AstaldiDesign optimisation for site works; about two weeks gained on coordination.
Mexico City airportMexico City · 2017AstaldiBid-stage BIM model of the terminal, 4D / 5D. 555,000 m².
Napoli–Bari railwayNaples, Italy · 2016Impresa PizzarottiDigital model of the route. 32 km.
Trieste waste-to-energy plantTrieste, Italy · 2021HERADigital models and construction-phase simulation. 100 GWh per year.

FAQ

Questions we hear

How can AI help a general contractor?

By measuring progress automatically against the BIM 4D plan, spotting safety violations on site cameras, forecasting delay and cost risk per work package, and reading tender documents to find inconsistencies before bidding.

Does it replace our project management software?

No. ConTxT reads the data your tools already produce (models, schedules, reports, cameras) and pushes decisions back to them.

Your data is already there. Let’s make it work.