Progress vs. BIM 4D
Measured progress per work package from drone, 360° and site captures.
Industry / Contractors
For general contractors the cost of a bad decision is measured in concrete, steel and time. Site and project teams get real-time progress against the plan, safety monitoring on every camera and early warning on cost and delay. Before the site even opens, RediGo helps win the tender.
ConTxT. for Contractors
ConTxT gives general contractors AI on the jobsite: progress measured against BIM 4D, computer-vision safety monitoring, forward-looking cost and delay risk, and AI support for public tenders.
Focus
Measured progress per work package from drone, 360° and site captures.
PPE, unsafe behaviour and access monitored on live video.
Variance and delay risk on the critical path, early enough to act.
Find the right public tenders, check the documents and draft the envelopes with RediGo.
Signal path
Case studies

Impresa Costruzioni Ing. Enrico Pasqualucci S.r.l.
Computer vision models analyze video streams to detect PPE violations, unsafe behaviors, and unauthorized access.

Impresa Costruzioni Ing. Enrico Pasqualucci S.r.l.
AI models compare BIM 4D planning with site data (images, scans) to automatically assess work progress.

Impresa Pizzarotti & C. S.p.A.
Development of a Digital Twin integrated with BMS and IoT data to monitor HVAC and critical systems. AI models identify anomalies and predict failures in advance.
Agents

Construction Progress Agent · assetOS
Cross-references BIM, schedule and on-site reports to surface cost and timeline drift in real time.

Worksite Safety Agent · assetOS
Computer vision watches every camera 24/7 for missing PPE, access breaches and risky behaviour.
Track record
| Project | Where · when | Client | Scope |
|---|---|---|---|
| Napoli Afragola station | Afragola, Italy · 2015 | Astaldi | Design optimisation for site works; about two weeks gained on coordination. |
| Mexico City airport | Mexico City · 2017 | Astaldi | Bid-stage BIM model of the terminal, 4D / 5D. 555,000 m². |
| Napoli–Bari railway | Naples, Italy · 2016 | Impresa Pizzarotti | Digital model of the route. 32 km. |
| Trieste waste-to-energy plant | Trieste, Italy · 2021 | HERA | Digital models and construction-phase simulation. 100 GWh per year. |
Solutions
FAQ
By measuring progress automatically against the BIM 4D plan, spotting safety violations on site cameras, forecasting delay and cost risk per work package, and reading tender documents to find inconsistencies before bidding.
No. ConTxT reads the data your tools already produce (models, schedules, reports, cameras) and pushes decisions back to them.
Products
The operating system for buildings, construction sites and infrastructure. One Brain and five specialised agents that understand sensors, drawings and people, and act in real time.
Visit assetos.contxt.it ↗RediGoredi-go.itFor Italian public tenders: find the tenders that fit your profile, check the documents for inconsistencies, draft the administrative, technical and economic envelopes and ask a co-pilot that knows the procurement code.
Visit redi-go.it ↗