BIM 4D vs. site comparison
Every capture is matched to the planned model and schedule, so progress is measured, not estimated.
Solution / Construction
AI models read BIM 4D schedules alongside site images, scans, drone and 360° captures to assess work progress automatically. Sal, the construction progress agent of assetOS, cross-references BIM, schedule and on-site reports to flag cost and timeline variance in real time.
What is Site Intelligence?
Site Intelligence is AI construction progress monitoring: it compares the BIM 4D plan with what site images, scans, drone and 360° captures show is actually built, and surfaces cost and schedule drift while it can still be recovered.
Data flow
Capabilities
Every capture is matched to the planned model and schedule, so progress is measured, not estimated.
Aerial and 360° captures are indexed by location and date and become searchable evidence.
Drift against plan is tracked per work package and surfaced as soon as it appears.
Forward-looking risk on the critical path, so teams act before the milestone slips.
Requests for information are linked to the elements and activities they affect.
Progress (SAL) reports are generated from the same data the site already produces.
Agents

Construction Progress Agent · assetOS
Cross-references BIM, schedule and on-site reports to surface cost and timeline drift in real time.
Every assetOS agent is a complete product: start with one, standalone, and join the full multi-agent Brain when it makes sense.
How it works
Collect · Input Layer
BIM, IoT, ERP and field captures normalised into one project graph - no manual mapping.
Monitor · AI Core
ConTxT classifies every document, sensor and event - flagging safety, quality and schedule risks the moment they appear.
Predict · Predictive Layer
Forecast delay risk, cost-to-complete, maintenance windows and energy demand across the asset lifecycle.
Case studies

Impresa Costruzioni Ing. Enrico Pasqualucci S.r.l.
AI models compare BIM 4D planning with site data (images, scans) to automatically assess work progress.
FAQ
It is the automatic comparison between the planned work (BIM 4D model and schedule) and what images, scans, drone and 360° captures show on site. Site Intelligence turns that comparison into progress percentages, variance and delay risk per work package.
A BIM model linked to the schedule (4D), the schedule or WBS, and site captures: photos, scans, drone flights or 360° walks. Site reports and RFIs add context.
Sal, the construction progress agent. It can run inside assetOS with the other agents or as a standalone product.
Related
Predictive maintenance and condition monitoring for physical assets.
Learn more →PlatformExtract, classify, and query across contracts, RFIs, and submittals.
Learn more →ConstructionAI-powered incident detection and compliance verification.